Burner opening and furnace tubes fabricated at the GBA workshop and ready for installation

Fabrication

  • Class material certificate included
  • Aut. bending process in-house

Global Boiler Aalborg have several decades of knowledge in the process of manufacturing boiler specific tube packages for a variety of boiler types from the most renowned OEM of boilers in the world.

Global Boiler Aalborg can bend very complicated tubes for boilers, i.e. tube nest for access openings and burner inlets. Correctly pre-bent tubes will minimize the installation time onboard as well as reduce the overall repair costs, compared to supplying base tube material for manipulation at site.

Global Boiler Aalborg builds on a long and well reputed background in the industry – with all key employees having more than 20 years individual background for construction, manufacture and repair of boilers.

Contact

Miura tubes after heat treatment and ready for installation

Tube bend fitted by Tig Welding.

Burner opening and furnace tubes fabricated at the GBA workshop and ready for installation

Stainless steel SH-Tubes fabricated and with welded stud for installation to header on main.

Complete SH-section (4-tubes and brackets).