New boiler and economizer

See other repair services

Engineer tube welding new WHR boiler

New boiler and economizer

Contact

2 new WHR boilers packed for vessels at dry dock in Gdańsk (Poland)

New boiler fabricated at the GBA workshop

New coil boiler fabricated at the workshop and prepared with refractory for installation onboard vessel

New lower part of a Gadelius boiler

New WHR boiler

Engineer tube welding new WHR boiler

Economizer coils

Oil-fired boiler

Loading a 10.000 kgh EGB element for a LNG vessel